How Long Does a Kitchen Remodel Take?

The first question most homeowners ask is how long they will be without a working kitchen. How long does a kitchen remodel take depends on size, complexity, material lead times and contractor availability. A full project can run one to six months, and planning alone can take one to three. Here is how that timeline breaks down, phase by phase.

Remodeling your kitchen is a great way to improve your home. It is exciting and comes with so many benefits. It can improve the aesthetics and functionality of your kitchen and even increase your home’s value. Unfortunately, it is not immediately apparent to busy homeowners how long a kitchen remodel will take. Luckily, RnD Builders can answer that question and more about the process. Below, you will find a timeline for the average kitchen remodel.

How Long Does a Kitchen Remodel Take?

A full kitchen remodel can take anywhere from one to six months, depending on several factors. Some of the factors include the size of your kitchen, the complexity of the remodel, and the availability of contractors. The availability of the materials you want to use also plays a significant role in the remodel timeline. Many homeowners are concerned about the timeline and how much it will impact their daily lives. However, it is important to recognize that the timeline includes the remodel preparation period, which can take a couple of months. To ensure your remodel stays on track, you should work with a reputable design and build firm. They can streamline the process to ensure your kitchen remodel is seamless. 

Kitchen Remodel Timeline

Planning a kitchen remodel involves several steps. Consider the following as you plan your kitchen remodel.

Planning The Remodel

A kitchen remodel involves making many decisions. This decision phase can take anywhere from one to three months, depending on how much of your kitchen you wish to change. This includes creating a budget. Determining the overall budget is the first step, as you need to know how much you can spend and where. Including additional funds is recommended, as many remodels go over budget. Plan for roughly ten to twenty percent. 

After you determine your budget, it is time to decide what you want for your kitchen. Everything from the design to the appliances needs to be chosen. It is also time to hire a team. A design-and-build firm is an excellent option, as they can streamline the entire process.

Order Materials

Once you have a team assembled, it is time to order what you need for the remodel. This is a crucial step that can take as little as a few weeks to a few months. The exact timing will depend on the availability of your requested materials, which will depend on many factors, including manufacturing location and shipping costs.

Construction

Most homeowners are worried about the period when construction happens. Depending on how fast your team is, this process can take anywhere from a few weeks to a few months. If you have all of your materials and a team that is ready to go, it can be exceptionally fast. However, delays do happen, so it is essential to plan accordingly. 

The construction process involves demolition and potential structural changes. From there, the installation of cabinets, countertops, and flooring begins. The final touches include painting, installing appliances, and adding fixtures. After the final details have been added, your team will clean up the area so it can be inspected.

From planning to permits, our kitchen remodeling services make projects like this simple — including for homeowners in Manhattan Beach and Redondo Beach. Free estimate: (805) 367-1965.

Continue exploring topics that pair well with this guide:

FAQ

Frequently Asked Questions

How long does a kitchen remodel take?

A full kitchen remodel can take anywhere from one to six months. The timeline depends on the size of your kitchen, the complexity of the remodel, contractor availability and the availability of your materials. It also includes the preparation period, which can take a couple of months.

How long does it take to plan a kitchen remodel?

The planning and decision phase can take one to three months, depending on how much of the kitchen you want to change. That includes setting a budget, choosing everything from the design to the appliances and hiring your team.

How long does it take to get materials for a kitchen remodel?

Ordering materials can take as little as a few weeks to a few months. Timing depends on the availability of what you selected, including manufacturing location and shipping.

How long does kitchen remodel construction take?

Construction can take anywhere from a few weeks to a few months. It runs from demolition and any structural changes to cabinets, countertops and flooring, then painting, appliances and fixtures. Having materials on site and a ready team makes it much faster.

How much extra should I budget for a kitchen remodel?

Plan for roughly ten to twenty percent above your base budget, because many remodels go over. Setting the overall budget is the first step, since it determines what you can spend and where.

Planning a Kitchen Remodel in Los Angeles?

Tell us what you want to change in your kitchen. We will set up a free consultation, map out a realistic timeline for your scope, and give you a real number before work starts.

Ready to start your project?

Schedule a consultation meeting today and get your project on the go!

We are glad to address any inquiries you may have. Please write us a few words about your project and we’ll set up a meeting with one of our project managers.

Tell us about your project

Our work

Completed Kitchen Remodeling Projects

Real homes RnD Builders finished across Los Angeles and Ventura County.

View all projects

Keep learning

Related Reading